Serving Beaverton & the surrounding areaOpen Mon–Sat 4am–4pm
Beaverton Porta Potty — Beaverton porta potty rental logoBEAVERTONPorta Potty (503) 994-0221
Now covering Greenway

Greenway Porta Potty Rental

Greenway Porta Potty Rental

Greenway wraps a big public park and the Fanno Creek floodplain, so parks contractors, trail crews and Scholls Ferry roadwork make up most of the restroom work here.

Park crews, trail work and creekside jobs

Beaverton Porta Potty porta potties on the delivery truck, headed to Greenway, OR
CountyWashington County
AreaGreenway Park, SW Hall Boulevard and Scholls Ferry Road
Typical lead timeTwo business days
Route dayTue / Fri

Parks district work across Greenway

The recreation district keeps a steady rotation of projects in Greenway, from playground replacements and path resurfacing to bridge decking over the creek. Crews on a Greenway park job usually work out of a gravel staging area near a trailhead, and a standard unit with a handwashing station goes in at that staging point rather than out on the turf. Because Greenway path work moves along the alignment week by week, we relocate the unit on the service visit instead of leaving crews a long walk back.

Volunteer planting days in Greenway are the other parks pattern, with fifty or more people out for a single Saturday morning. For those we drop two standard units and a handwashing station at the Greenway trailhead lot on Friday and collect them the following week.

Fanno Creek flooding and Greenway placement

Fanno Creek runs the length of Greenway and it comes up fast, spilling across the lower meadow several times each winter. Nothing goes on the Greenway floodplain between late fall and spring, and even in summer we keep units up on the paved path edge or the parking apron. A unit left low in Greenway during a December rain event can float, tip and become somebody else's problem downstream.

The wetland soils through Greenway are peaty and slow to drain, so even a dry-looking margin will rut under a loaded truck. We stick to the asphalt lot and the firm shoulders when placing Greenway units, which also keeps the service route short.

Roadwork, offices and events around Greenway

Scholls Ferry Road and Hall Boulevard bracket Greenway, and utility and paving contractors on both corridors take units for the length of a closure. Those Greenway roadwork orders move nightly in some phases, so we settle a drop point that stays reachable even when the lane pattern changes.

The office buildings on the Greenway edge run their own smaller jobs, mostly parking lot resealing, roof replacement and landscape rebuilds in the dry season. A single unit behind the building covers most of them, and Greenway tenants rarely see it from the entrance at all.

Around Greenway

Units We Deliver to Greenway

Standard Porta Potty

Standard units serve Greenway path resurfacing and playground rebuilds, set at the gravel staging pad so the parks crew is never more than a short walk from the trailhead.

See details

Deluxe Flushing Porta Potty

Deluxe flushing units go to Greenway summer concerts and company picnics in the park, where families line between sets and a foot-flush bowl with a sink holds up better.

See details

ADA Accessible Porta Potty

An ADA accessible unit sits on the Greenway parking apron beside the paved loop, which is the only firm level ground in the park that a wheelchair can reach year round.

See details

Handwashing Station

Handwashing stations follow Greenway planting and mulching volunteers, and they go out with every creekside restoration crew handling wet sediment along the Fanno Creek channel.

See details

Luxury Restroom Trailer

The climate-controlled restroom trailer covers Greenway wedding receptions and evening fundraisers held under tents on the upper lawn, well back from the creek and close to the lot.

See details
Greenway · OR

Questions from Greenway

Will a unit stay safe on the Fanno Creek floodplain at Greenway?

Not in winter. The Greenway meadow floods repeatedly between November and March, so units go on the paved path shoulder or the trailhead lot instead, where the truck can also reach them without rutting soft wetland ground.

Can you move a unit along a Greenway trail project as it advances?

Yes. Trail work through Greenway walks along the alignment, so we reposition the unit at each service visit to whatever access point the crew is working from, at no change to the standing schedule.

What covers a Saturday volunteer planting day in Greenway?

Two standard units and a handwashing station handle a Greenway planting crowd of fifty or so. We stage them at the trailhead lot on Friday and collect the following week, which keeps the weekend free of truck traffic.

Do Greenway office buildings need anything beyond one standard unit?

Usually not. A parking lot reseal or roof replacement on the Greenway office edge runs with a single unit tucked behind the building, though a handwashing station is worth adding for roofing and coatings crews.

How is a Scholls Ferry Road closure beside Greenway handled?

Nightly lane patterns change, so we fix one drop point on the Greenway side that stays reachable throughout, then service it on the agreed route day. Tell us the traffic control contact and the driver coordinates on arrival.

Same route as Greenway · OR

Get your Beaverton delivery on the calendar.

One call to (503) 994-0221 puts the drop, the service and the pickup on the calendar across Beaverton and the surrounding Oregon area.

Call (503) 994-0221
Tap to call · (503) 994-0221